Skip to product information
Vesgantti 80' Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, 2 Seater Compact Modular Couch, Boneless Sectional Sofa for Small Spaces, No Assembly Required, Beige
Sale price
$94.04
Regular price $239.99
Features & Specs
- Is Customizable? : No
- Is Modular : Yes
- Item Firmness Description : Medium-Soft
- Seat Cushion Configuration : Single Cushion Seat
- Seating Capacity : 2
- Weight Capacity Maximum : 600 Pounds
Item details
- ASIN : B0GTY5TXYT
- Brand Name : Vesgantti
- Included Components : Sectional Sofa, Throw Pillow, Unpacking tool
- Indoor Outdoor Usage : Indoor
- Manufacturer : Vesgantti
- Manufacturer Part Number : A5SF12
- Model Number : A5SF12-Beige-2
- Orientation : modular
- Set Name : Modular Sectional Couch
- Sofa Type : Sectional
- UPC : 199967067604
Materials & Care
- Back Cushion Removability : Removable
- Fill Material : High Density Foam
- Has Removable Seat Cushion Cover : false
- Material Features : Ultra-soft, easy-care, wrinkle-resistant, and durable
- Material Type : High Density Foam
- Seat Back Fill Material : Foam
- Seat Fill Material : Foam
- Upholstery Fabric Type : Corduroy
Measurements
- Arm Height : 26.4 Inches
- Arm Width : 10.2 Inches
- Item Dimensions : 39.8 x 79.6 x 32.3 inches
- Item Dimensions D x W x H : 39.8'D x 79.6'W x 32.3'H
- Item Weight : 46 Pounds
- Seat Depth : 21.7 inches
- Seat Height : 17.3 Inches
Style
- Color : 80' - 2 Seater Beige
- Pattern : Solid
- Style Name : Modern
User guide
- Assembly Instructions Description : No assembly required. Simply unbox and arrange the modules to start relaxing in minutes.
- Component Connector Assembly : Not Required
- Required Assembly : No