Skip to product information
Vesgantti 159' Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with 2 Movable Ottomans, No Assembly Needed, Green
Sale price
$222.69
Regular price $629.99
Features & Specs
- Is Customizable? : No
- Is Modular : Yes
- Item Firmness Description : Medium-Soft
- Seat Cushion Configuration : Single Cushion Seat
- Seating Capacity : 6
- Weight Capacity Maximum : 1800 Pounds
Item details
- ASIN : B0GTYTFX4G
- Brand Name : Vesgantti
- Included Components : Sectional Sofa, Throw Pillow, Unpacking tool
- Indoor Outdoor Usage : Indoor
- Manufacturer : Vesgantti
- Manufacturer Part Number : A5SF12
- Model Number : A5SF12-Green4+2
- Orientation : modular
- Set Name : Modular Sectional Couch
- Sofa Type : Sectional
- UPC : 199967067734
Materials & Care
- Back Cushion Removability : Removable
- Fill Material : High Density Foam
- Has Removable Seat Cushion Cover : false
- Material Features : Ultra-soft, easy-care, wrinkle-resistant, and durable
- Material Type : High Density Foam
- Seat Back Fill Material : Foam
- Seat Fill Material : Foam
- Upholstery Fabric Type : Corduroy
Measurements
- Arm Height : 26.4 Inches
- Arm Width : 10.2 Inches
- Item Dimensions : 79.6 x 159 x 32.3 inches
- Item Dimensions D x W x H : 79.6'D x 159'W x 32.3'H
- Item Weight : 46 Pounds
- Seat Depth : 21.7 inches
- Seat Height : 17.3 Inches
Style
- Color : 159' - 4 Seater + 2 Ottoman Green
- Pattern : Solid
- Shape : Semicircular
- Style Name : Modern
User guide
- Assembly Instructions Description : No assembly required. Simply unbox and arrange the modules to start relaxing in minutes.
- Component Connector Assembly : Not Required
- Required Assembly : No