Vesgantti 159' Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with 2 Movable Ottomans, No Assembly Needed, Beige

Vesgantti 159' Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with 2 Movable Ottomans, No Assembly Needed, Beige

159' - 4 Seater + 2 Ottoman Beige
Sale price  $227.02 Regular price $629.99
Skip to product information
Vesgantti 159' Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with 2 Movable Ottomans, No Assembly Needed, Beige

Vesgantti 159' Large Modular Sectional Sofa, U-Shaped Corduroy Cloud Couch with Deep Seats & Spring Support, 4-Seater Boneless Sofa with 2 Movable Ottomans, No Assembly Needed, Beige

Sale price  $227.02 Regular price $629.99
Color159' - 4 Seater + 2 Ottoman Beige

Features & Specs

  • Is Customizable? : No
  • Is Modular : Yes
  • Item Firmness Description : Medium-Soft
  • Seat Cushion Configuration : Single Cushion Seat
  • Seating Capacity : 6
  • Weight Capacity Maximum : 1800 Pounds

Item details

  • ASIN : B0GTYV92P4
  • Brand Name : Vesgantti
  • Included Components : Sectional Sofa, Throw Pillow, Unpacking tool
  • Indoor Outdoor Usage : Indoor
  • Manufacturer : Vesgantti
  • Manufacturer Part Number : A5SF12
  • Model Number : A5SF12-Beige4+2
  • Orientation : modular
  • Set Name : Modular Sectional Couch
  • Sofa Type : Sectional
  • UPC : 199967067727

Materials & Care

  • Back Cushion Removability : Removable
  • Fill Material : High Density Foam
  • Has Removable Seat Cushion Cover : false
  • Material Features : Ultra-soft, easy-care, wrinkle-resistant, and durable
  • Material Type : High Density Foam
  • Seat Back Fill Material : Foam
  • Seat Fill Material : Foam
  • Upholstery Fabric Type : Corduroy

Measurements

  • Arm Height : 26.4 Inches
  • Arm Width : 10.2 Inches
  • Item Dimensions : 79.6 x 159 x 32.3 inches
  • Item Dimensions D x W x H : 79.6'D x 159'W x 32.3'H
  • Item Weight : 46 Pounds
  • Seat Depth : 21.7 inches
  • Seat Height : 17.3 Inches
  • Size : 159' x 79.6' x 32.3' (Width x Length x Height)

Style

  • Color : 159' - 4 Seater + 2 Ottoman Beige
  • Finish Types : Textured
  • Pattern : Solid
  • Shape : Semicircular
  • Style Name : Modern
  • Upholstery Color : Beige

User guide

  • Assembly Instructions Description : No assembly required. Simply unbox and arrange the modules to start relaxing in minutes.
  • Component Connector Assembly : Not Required
  • Required Assembly : No

You may also like